Effects of high pressure and high temperature on thickening time of cement slurry in the cementing process at Nam Con Son basin
Abstract
Thickening time is an important parameter that affects the well cementing process - a decisive step in the quality and efficiency of well operation. During the pumping process, the thickening time of the slurry needs to be greater than the pumping time. Otherwise, problems will occur due to cement curing prematurely before technological processes are implemented, easily leading to complications and incidents, causing waste of materials and costs, and prolonging construction time. Currently, to construct the oil and gas wells, G-grade Portland cement - a popular type of cement for deep well constructions - is normally used. However, under high pressure and high temperature conditions in the Nam Con Son basin, it is necessary to add silica heat-stable additives to ensure the thickening time of the cement slurry is consistent with the conditions of the well.
References
Phạm Trường Giang, Lê Vũ Quân, Nguyễn Minh Quý, Lê Thị Thu Hường, Đỗ Văn Hiển, và Trương Hoài Nam, “Tổng kết và đánh giá công tác bơm trám xi măng cho các giếng khoan có nhiệt độ và áp suất cao tại bể Nam Côn Sơn”, Tạp chí Dầu khí, Số 7, trang 21 - 29, 2014.
Trần Hồng Nam, Lê Trần Minh Trí, Nguyễn Kiên Cường, Trịnh Ngọc Bảo, và Mike Nguyễn, “Thiết kế giếng phát triển mỏ áp suất cao và nhiệt độ cao - Những điều cần lưu ý”, Tuyển tập Báo cáo Hội nghị Khoa học và Công nghệ quốc tế - Dầu khí Việt Nam 2010: Tăng tốc phát triển, Nhà xuất bản Khoa học và Kỹ thuật, Quyển I, trang 620 - 633, 2010.
Arash Shadravan and Mahmood Aman, “HPHT 101: What every engineer or geoscientist should know about high pressure high temperature wells”, SPE Kuwait International Petroleum Conference and Exhibition, Kuwait City, Kuwait, 10 - 12 December 2012. DOI: 10.2118/163376- MS.
Keelan Adamson, George Birch, Erhu Gao, Steve Hand, Colin Macdonald, David Mack, and Anver Quaclri “High-pressure, high-temperature well construction”, Oilfield Review, 1998.
Prisca Salima and Mahmood Amani, “Special considerations in cementing high pressure high temperature wells”, International Journal of Engineering and Applied Sciences, Volume 1, Issue 4, pp. 120 - 143, 2013.
H. Rabia, Oilwell drilling engineering: Principles and practice. Graham & Trotman, 1986.
Ofite, “Испытания тампонажных цементов в соответствии со стандартами API/ISO: аппаратная реализация методов”. [Online]. Available: http://www. ofite.ru/node/258.
S.R. Shadizadeh, M. Kholghi, and M.H. Salehi Kassaei, “Experimental investigation of silica fume as a cement extender for liner cementing in Iranian oil/gas wells”, Iranian Journal of Chemical Engineering, Volume 7, Issue 1, 2010.
1. The Author assigns all copyright in and to the article (the Work) to the Petrovietnam Journal, including the right to publish, republish, transmit, sell and distribute the Work in whole or in part in electronic and print editions of the Journal, in all media of expression now known or later developed.
2. By this assignment of copyright to the Petrovietnam Journal, reproduction, posting, transmission, distribution or other use of the Work in whole or in part in any medium by the Author requires a full citation to the Journal, suitable in form and content as follows: title of article, authors’ names, journal title, volume, issue, year, copyright owner as specified in the Journal, DOI number. Links to the final article published on the website of the Journal are encouraged.